Hampton Hotel Al Barsha

Project Description

The project is a three-star hotel consisting of ground +10 typical floors +roof at Al
Barsha Dubai. The scope of subcontract comprises the design, engineering, supply, installation,
testing and commissioning of aluminum, glazing, and metal works.

Project Information

    Client:                      Abdulla Saeed Amer Hamadi

    Main Contractor:     Arabtec Construction LLC

    Consultant:              Engineering Consultants Group

    Value:                      AED 4.5 Million

    Duration:                 12 months